HIRA: Hazard Identification and Risk Assessment
Break work into activities, identify hazards, rate risk, apply the hierarchy of controls and verify that controls are actually in place.
Why it matters
HIRA is the foundation of most safety management systems. Done well, it prevents injuries before they happen; done as paperwork, it gives false confidence.
Who it's for: Supervisors, safety officers, engineers and anyone preparing site risk assessments.
Learning objectives — by the end you can:
- Explain the difference between a hazard and a risk.
- Complete a HIRA row from activity through to verification.
- Apply the hierarchy of controls when selecting additional controls.
- Recognise that scoring conventions vary by organisation.
Key terms
- Hazard
- Something with the potential to cause harm (e.g. energised cable, moving forklift).
- Risk
- The combination of likelihood of harm and its severity.
- Severity
- How serious the harm could be, from first aid to fatality.
- Hierarchy of controls
- Elimination → Substitution → Engineering → Administrative → PPE.
- Verification
- Checking that a control is in place and working, not just written down.
Lesson notes
HIRA worksheet flow
- 1Activity / task
- 2Hazard
- 3Potential consequence
- 4Existing controls
- 5Initial Likelihood × Severity → Initial risk
- 6Additional controls (use the hierarchy of controls)
- 7Responsible person and due date
- 8Residual risk
- 9Verification (who checked, when, evidence)
Hierarchy of controls
| Level | Example | Effectiveness |
|---|---|---|
| Elimination | Do the task at ground level instead of at height | Most effective |
| Substitution | Use a water-based paint instead of solvent-based | High |
| Engineering | Guardrails, machine guards, local exhaust ventilation | Good |
| Administrative | Permits, procedures, training, signage | Depends on people |
| PPE | Harness, gloves, respirator | Last line of defence |
A note on scoring
Many sites use Likelihood × Severity on 1–5 scales; others use 1–3 or qualitative bands. Use your organisation's approved method. High-risk work always needs competent people and site-specific review.
Video lesson
Video to be added
A verified video from an official or reputable channel has not yet been selected for this topic. The text lesson above covers the full content.
Search YouTube for related videosPractical story: The roof-light that wasn't on the HIRA
Fictional teaching example
Situation. A maintenance team planned gutter cleaning on a warehouse roof using a generic HIRA.
Known facts
- The generic HIRA covered edge protection but not fragile roof-lights.
- A supervisor walked the roof before work and spotted unmarked roof-lights.
Decisions
- Work was paused and the HIRA updated with a 'fall through fragile surface' hazard.
- Controls: covers over roof-lights (engineering), defined walkway, permit and harness as backup.
Outcome. Work completed safely a day later. The site added a fragile-roof register.
Lessons
- Generic assessments miss site-specific hazards.
- Walk the job.
- Prefer engineering controls over relying on PPE.
Worked example
Worked example: one HIRA row
| Field | Entry |
|---|---|
| Activity | Changing lamps in a 4 m high corridor |
| Hazard | Fall from ladder; electric shock |
| Consequence | Fracture, head injury; shock/burn |
| Existing controls | Step ladder, trained electrician |
| Initial L × S | 3 × 4 = 12 (High, illustrative) |
| Additional controls | Isolate circuit and lock off; use podium step instead of ladder |
| Responsible / due | Maintenance supervisor / before next job |
| Residual L × S | 1 × 4 = 4 (Low) |
| Verification | Supervisor checks isolation and podium on site; signs permit |
Practice exercise
Complete one HIRA row for 'Manually unloading 20 kg boxes from a van'.
HIRA worksheet template (CSV)Quiz
Sign in to save quiz results.
References
- Official guidanceHSE (UK) — Managing risks and risk assessment at work
- Official guidanceOSHA — Hierarchy of controls
- StandardISO 45001 Occupational health and safety (overview)
Verify current editions and applicability. Standards are copyrighted; consult licensed copies for exact requirements.
Report an issue with this contentRelated topics
Risk Assessment
JSA / JHA: Job Safety Analysis
Break a job into steps, identify hazards at each step and agree controls before work starts.
High-Risk Work Controls
Permit-to-Work and Lockout/Tagout (LOTO)
How permits control high-risk work, and how isolation with locks and tags prevents unexpected release of hazardous energy.
Emergency Roles
Fire Warden Awareness
What fire wardens do before, during and after an alarm — and what they must not do.